Also, her new bed is assembled and embellished.
1 year ago
Also, her new bed is assembled and embellished.
1 year ago
The new curtains and blinds for ther bedrooms and second lounge are up. Here are the lacy curtains for the girl’s room.
1 year ago
The entrance to the house has had the concrete treatment. Perhaps one, maybe two coats done.
1 year ago
Drop-cloths are down which is good because the lounge has been painted!
1 year ago
The shelves are installed in lounge #2. Immediately they fill up with crap.
1 year ago
The drains from the basins are connected to the main outflow. A retaining wall is needed to hold the gravel cover.
1 year ago
Bath panels are fitted and partially sealed.
1 year ago
The full console, although one button doesn’t seem to do anything.
1 year ago
A small-fan heater to keep things toasty over winter.
1 year ago
One of the heated towel rails is located next to the shower. Smart thinking that!
1 year ago
This is the mixer and spout for the bath. They work beautifully.
1 year ago
This is a vertical tower vanity instead of a chunky cabinet under the basins.
1 year ago
Here’s the second toilet and associated bits-and-bobs.
1 year ago
Here’s both of them side-by-side (hmm and ‘ers).
1 year ago
The bathroom fixtures are done! Here are the mirrors and shelves above the basins. Behind the mirrors are demisters and, unfortunately the lights that were supposed to go above them didn’t fit.
1 year ago