The countdown is official
Here’s a timer widget that’s counting down till all contractors are gone! The timer...
May 23rd
The retaining wall, gravel, dirt and drains are all done....
May 22nd
The remaining corrogate external cladding is on the way up....
May 21st
We have feature wall in the main lounge covered in new wall...
May 15th
And another from the wall paper collection.
May 15th
The extension has new soffits so all the underfloor...
May 14th
Almost forgot, the apallingly built retaining wall that we...
May 14th
Here are the new steps leading from the driveway.
May 14th
There is a new platform leading from the entrance steps to a...
May 14th
Simon has been busy. The kitchen has a new red feature wall....
May 14th
The new retaining wall as asked for by the council has been...
May 13th
The abominations that were bi-folding doors in the master...
May 13th
His bunks are back together with hot wheels bedding.
May 13th
The boy got spots (which match the wall colours somehow).
May 13th
A fairy princess wall for a fairy princess.
May 13th
Also, her new bed is assembled and embellished.
May 13th
The new curtains and blinds for ther bedrooms and second...
May 13th
The entrance to the house has had the concrete treatment....
May 12th
Drop-cloths are down which is good because the lounge has...
May 12th
The shelves are installed in lounge #2. Immediately they...
May 9th
The drains from the basins are connected to the main...
May 9th
Bath panels are fitted and partially sealed.
May 9th
The full console, although one button doesn’t seem to...
May 3rd
A small-fan heater to keep things toasty over winter.
May 3rd
One of the heated towel rails is located next to the shower....
May 3rd
This is the mixer and spout for the bath. They work...
May 3rd
This is a vertical tower vanity instead of a chunky cabinet...
May 3rd
Here’s the second toilet and associated bits-and-bobs....
May 3rd
Here’s both of them side-by-side (hmm and ‘ers)....
May 3rd
The bathroom fixtures are done! Here are the mirrors and...
May 3rd
The medicine cabinet finally arrived and is installed above...
Apr 30th
The bedroom doors have new door handles.
Apr 30th